900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 混凝土管段 Concrete tube section英语短句 例句大全

混凝土管段 Concrete tube section英语短句 例句大全

时间:2022-09-06 13:41:24

相关推荐

混凝土管段 Concrete tube section英语短句 例句大全

混凝土管段,Concrete tube section

1)Concrete tube section混凝土管段

英文短句/例句

1.Cracks Control Technology for Concrete Tube Sections of Immersed Tunnels大型沉管隧道混凝土管段混凝土裂缝控制技术

2.Calculation of Cable Forces of CFST Arch Bridge during Core Concrete Casting钢管混凝土拱桥管内混凝土灌注阶段扣索力计算

3.reinforced concrete lining segment钢筋混凝土衬砌节段

4.The Finite Element Analysis of CFST Arch Bridge with Combinated System during Construction Procedure;钢管混凝土组合拱桥施工阶段有限元分析

5.Concrete and reinforced concrete drainage and sewer pipesGB/T11836-1989混凝土和钢筋混凝土排水管

6.Study on the Anti-disturbance of Concrete in the Setting and Hardening Period混凝土凝结硬化阶段抗扰动性能研究

7.centrifugally cast pipe离心浇灌钢筋混凝土管

8.pipe concrete coating thickness管子混凝土加重层厚度

9.Interaction of steel pipe and concrete in concrete-filled steel tube arch bridge钢管混凝土拱桥中钢管与混凝土相互作用问题

10.Risk Assessment and Risk Management for Cantilever Cast Pre-stresed Concrete Continuous Bridge during Construction Stage;悬臂浇筑预应力混凝土连续梁施工阶段风险评估和风险管理

11.Study on Mechanical Property of Reinforced Concrete Box Arch with Stiffness Frame of Minor Steel Tubes during Construction;小钢管劲性骨架混凝土箱拱施工阶段力学性能研究

12.The Research on Structure Behavior of Long Span X-type CFST Arch Bridge during Construction Process;大跨度提篮型钢管混凝土拱桥施工阶段结构受力性能研究

13.Theory Analysis and Segment Test Study of the Ultimate Load Capacity on Concrete Filled Steel Tubular Arch Bridge;钢管混凝土拱肋极限承载力理论分析及节段试验研究

14.Research on Displacement of Piers of Concrete-filled Steel Tubular Tied Rigid Frame Through Arch Bridge on Construction Stages;下承式钢管混凝土刚架系杆拱桥施工阶段主墩变位的研究

15.The Research of System Dynamic Optimizing Control of Concrete Construction Management of Three Gorges Sluicing Dam;三峡泄洪坝段混凝土施工管理系统动态优化控制研究

16.Nonlinear Stress Analysis of CFST Arch Bridge in Construction and Service钢管混凝土拱桥施工及营运阶段非线性应力分析

17.Test methods of concrete and reinforced concrete drainage and sewer pipesGB/T16752-1997混凝土和钢筋混凝土排水管试验方法

18.Test methods of the concrete compressive strength of concrete pipes for waterGB/T11837-1989混凝土管用混凝土抗压强度试验方法

相关短句/例句

cone tube concrete锥管段混凝土

3)concrete pipe混凝土管

1.Cost-effective analysis between truck crane and gantry crane inconcrete pipe installation;汽车起重机与龙门吊架安装混凝土管的比较

2.The constructional method of largeconcrete pipe glass steel sleeve;大型混凝土管玻璃钢衬里的施工方法

3.A HDPE pipe used for lining is penetrated into aconcrete pipe then it forms pipe-in-pipe structure so as to raise pressure bearing capacity of theconcrete pipe.HDPE管具有强度高、耐腐蚀、使用寿命长、管壁光滑、不结垢等优点,内衬HDPE管可与混凝土管形成整体性良好的管中管结构,使混凝土管承压能力大大提高。

4)lift line混凝土层段

5)concrete-filled steel tube钢管混凝土

1.Research and engineering application about defects detection ofconcrete-filled steel tube by ultrasonic method;超声法检测钢管混凝土缺陷的研究及工程应用

2.Ultrasonic testing for rectangle section ofconcrete-filled steel tube;方形截面的钢管混凝土超声法检测探讨

3.Finite element simulation on seismic behavior of Concrete-filled steel tube-reinforced concrete ring beam joint;钢管混凝土柱-钢筋混凝土环梁节点抗震性能的有限元模拟

6)concrete filled steel tube钢管混凝土

1.Test analysis of the suspender force of the large spanconcrete filled steel tube arch bridge;大跨度钢管混凝土拱桥吊杆索力测试分析

2.Seismic behavior research of composite shear wall withconcrete filled steel tube columns for different axial-load ratios;不同轴压比下钢管混凝土边框组合剪力墙抗震性能研究

3.Seismic experimental research on high strength concrete composite shear wall withconcrete filled steel tube columns;钢管混凝土边框高强混凝土组合剪力墙抗震性能试验研究

延伸阅读

管段分段管理的地段:这一~的治安状况良好。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。