900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 施工偏压 construction progress partial pressure英语短句 例句大全

施工偏压 construction progress partial pressure英语短句 例句大全

时间:2019-08-28 18:26:39

相关推荐

施工偏压 construction progress partial pressure英语短句 例句大全

施工偏压,construction progress partial pressure

1)construction progress partial pressure施工偏压

1.Based on the finite element analysis of double-arched tunnel under terrain partial pressure andconstruction progress partial pressure separately,the deformation and mechanics of middle wall of double-arched tunnel are mainly analyzed in this paper.基于连拱隧道分别在地形偏压与施工偏压条件下完成了数值模拟,并对中墙内力及变形情况进行了分析。

2)the construction of rectify纠偏施工

英文短句/例句

1.Deviation Rectification Construction Technology of Jack-up method of Switching House in Baoxing Corporation,Ningbo宁波宝新公司配电室顶升法纠偏施工技术

2.Causes and Adjustment Measures for Pipe Deviation during Construction顶管施工中管道偏差成因及纠偏措施

3.An Example of Rectification of Design and Construction for a Six-Story Masonry Building某六层砌体房屋纠偏设计与施工实例

4.On prevention and correcting measures of pipeline displacement in pipeline jacking construction谈管道顶进施工中管道偏位的预防和纠正措施

5.Design and Construction of Rectification and Consolidation of Water Gate沙湾镇涌口水闸纠偏加固工程的设计与施工

6.Analysis and correction of deviation in control over engineering cost of construction enterprises;施工企业工程成本控制中偏差的分析与纠正

7.Talking about the Hole-site Correcting Technology in Drilled Pile Construction on Granite Plagioclase Strata花岗岩斜岩地层钻孔桩施工孔位纠偏技术

8.Design and Construction of Rectification and Reinforcement for a Bottom Frame Masonry-Concrete Residence in Qianjiang, Chongqing重庆黔江某底框砖混住宅基础纠偏加固的设计与施工

9.The Lane Departure Warning System Based on CPCI基于CPCI的车载纠偏系统的研究与实施

10.Construction Project Turn-key Contract Dispute"s Production and Prevention建设工程施工合同纠纷的产生及预防

11.Deviation and correct of personnel check work in modern enterprise;现代企业人事考评工作中的偏差与纠正

12.It will produce the adverse effect on project quality in the course of deviation and rectifying a deviation.在偏离和纠偏过程中 ,都会对工程质量产生不利影响。

13.Deviation rectification by design of foundation reinforcement and construction of the residential building某住宅楼纠倾及地基加固设计与施工

14.Study on the Judicial Experience for the Trial of Cases of Dispute over Contracts on Undertaking Construction Projects;建设工程施工合同纠纷案件审判实务研究

15.The reason of the contract issue in the mine engineering and its measures;矿山工程施工合同纠纷产生的原因及预防

16.Study on Prevention and Resolution Countermeasures to Construction Contract Disputes建设工程施工合同纠纷预防和解决对策研究

17.Discussed Shallowly the Highway Engineering Construction Item Settles Accounts Dispute"s Guard Countermeasure浅谈公路工程施工项目结算纠纷的防范对策

18.Construction technology for adjustment of 1750 t concrete box pier top deviation1750t混凝土箱梁墩顶偏差调整施工工艺

相关短句/例句

the construction of rectify纠偏施工

3)construction error施工偏差

1.Stochastic carbonation durability analysis of pre-stressed concrete structure regardingconstruction error of concrete cover;基于保护层施工偏差的预应力混凝土结构碳化耐久性研究

2.The influence ofconstruction error such as vertical deviation of column etc,are frequently met in construction.超高层钢结构安装过程中的柱身垂偏等施工偏差对结构性能的影响程度是工程中经常遇到的问题。

4)eccentric construction sector偏心施工段

5)fracturing operation压裂施工

1.Calculation of pipe string friction duringfracturing operation in Chuanxi area;川西地区压裂施工过程中管柱摩阻计算

6)pressure-casting construction压注施工

延伸阅读

施工施工constructionshlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段.核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备.施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。