施工期隧道,tunnel in construction

1)tunnel in construction施工期隧道

1.Based on the previous research,lattice girder reinforced shotcrete support is dealt with,and a method is set up to evaluate the safety of this kind of support for atunnel in construction.在过去研究成果基础上,建立施工期隧道格栅钢架喷混凝土支护的安全性评价方法。

英文短句/例句

1.Assessment on the Safety of Tunnel Lining Structures under Construction;施工期隧道衬砌结构安全性评价方法研究

2.A Method to Assess the Safety of the Primary Lining of Tunnels under Construction with Consideration of Shrinkage and Creep of Shotcrete;考虑干缩和徐变的施工期隧道初期支护安全性评估方法

3.Analysis of risk probability of construction time for Taihangshan tunnel;太行山隧道施工工期的风险概率性分析

4.Analysis and Control for Upward Movement of Shield Tunnel during Construction;软土盾构隧道施工期上浮机理分析及控制研究

5.Study on Ground Settlement Monitoring Due to Shield Construction in Metro Tunnel;地铁盾构隧道施工期地表沉降监测研究

6.Simple Talking about Construction of Spraying Wet Concrete to Support at Initial Stage in Tunnel浅谈隧道初期支护喷射混凝土湿喷施工

7.Elasto-Plasticity of Circular Tunnel Consioering Seepaye Field in the Construction Period施工期考虑渗流场影响圆形隧道的弹塑性解

8.Calculation of Ground Subsidence Caused by Shield Tunnel Construction盾构隧道施工期引起的地面沉降计算方法探析

9.On the supporting design and construction in primary period of the expansive surrounding rock along the extra-long tunnel in highly cool areas高寒地区特长隧道膨胀围岩初期支护设计施工

10.Technical code for construction of highway tunnel公路隧道施工技术规范

11.Long Tunnel Construction Period of Air Quality Control Measures and Research;长大隧道施工期空气环境质量分析及其控制措施研究

12.Study on Mechanical Characteristics of Primary Reinforcement of Single-arch Four-lane Highway Tunnels under Different Construction Methods单拱4车道公路隧道不同施工方法下初期支护力学特征研究

13.A Numerical Analysis of the Ice-wall Thickness and the Freezing Period for Guangzhou Metro Tunnel;广州某地铁隧道人工冻结法施工冻结壁厚度及冻结周期计算

14.Tunnel collapse is frequently accident in tunnel construction.隧道塌方是隧道施工中比较常见的事故。

15.Tunnel Informatization Construction on Geleshan Mountain Tunnel and Daping Light Railway in Chongqing City;歌乐山隧道与重庆轻轨大坪隧道的信息化施工

16.Numerical Analysis of the Influence of Tunneling Blasting on the Existing Tunnel;邻近隧道爆破施工对既有隧道影响的数值分析

17.Analysis for Influence of a Road Subway Construction on Metro Tunnel in Service某城市下沉隧道施工对地铁隧道的影响分析

18.Effect of Blasting in Double Line Tunnel on Existing Tunnel复线隧道施工爆破对既有隧道结构的影响分析

相关短句/例句

Tunneling[英]["t?n?l??][美]["t?n?l??]隧道施工

1.Application of image method in calculating tunneling-induced soil displacement;镜像法在隧道施工土体位移计算中的应用

2.Geological forecast beforehand tunneling of Goumowan;新建狗磨湾隧道施工超前地质预报

3.Tamping tube curtain method is a new tunneling metho d.夯管帷幕施工工法是一种全新的隧道施工工法。

3)tunnel construction隧道施工

1.Application of shed-pipe support totunnel construction of Changheba Project;管棚支护在长河坝隧道施工中的应用

2.Research on fuzzy control approach for ventilation system intunnel construction;隧道施工通风系统模糊控制方法研究

3.Application of splitting curtain grouting in ultra-shallowtunnel construction;劈裂帷幕注浆法在超浅埋隧道施工中的应用

4)Tunnelling["t?n?li?]隧道施工

1.In this paper,the measures for solving the problem of time limit shortage and for tunnelling in soft and weak soil are discussed.本文介绍该段重点隧道施工中如何解决工期矛盾和软弱围岩隧道施工的技术措施。

5)tunnel excavation隧道施工

1.Simulating thetunnel excavation by computer to know the geologic features of the underground rock and the distribution of the stratal configuration of the tunnel project was an important way of research at present.该方法在铁路隧道工程的虚拟开挖实际中取得良好效果,为决策隧道施工建设提供科学依据。

6)tunnel construction施工隧道

1.Analyze technology of pre-detecting geological disaster fortunnel construction;公路施工隧道地质灾害超前预报技术分析

延伸阅读

施工施工constructionshlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段.核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备.施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。