900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 施工阶段质量策划 the quality of the construction phase plan英语短句 例句大全

施工阶段质量策划 the quality of the construction phase plan英语短句 例句大全

时间:2020-10-08 20:51:19

相关推荐

施工阶段质量策划 the quality of the construction phase plan英语短句 例句大全

施工阶段质量策划,the quality of the construction phase plan

1)the quality of the construction phase plan施工阶段质量策划

2)QualitQuality Control of the Construction Phase施工阶段质量控制

英文短句/例句

1.Project Quality Management and Quality Control in Construction;工程项目质量管理与施工阶段质量控制

2.Study on Expert System for Management s Quality Control of Building Construction in Construction Period;建筑工程监理施工阶段质量控制专家系统研究

3.The Research on Construction Phase Construction Project of Quality Control System建筑工程项目施工阶段质量控制的系统研究

4.Quality Control Risks of Construction Agent Project on Carrying Out;代建制项目施工阶段质量控制风险研究

5.Research on Quality Control in Project Building Stage;建筑工程项目施工阶段的质量控制研究

6.Analysis and Control on Cost of Quality of Consturction Stage in Construction Engineering;建筑工程施工阶段质量成本的分析与控制

7.On quality control of inspection engineers over architectural energy-saving at construction stage监理工程师在施工阶段对建筑节能的质量控制

8.Quality and Investment Control at the Construction Stage of Oilfield Ground Construction Projects;谈油田地面建设项目施工阶段质量与投资控制

9.Analysis of construction points and quality control in the phase of civit construction for municipal wastewater treatment plant污水处理厂土建阶段施工要点及质量控制分析

10.How to Intensify Quality Control during Construction by Supervision Engineer监理工程师应如何加强工程施工阶段的质量控制

11.The supervision on quality control of open-cut works is carried forward correspondingly to beforehand, interim and final stage.监理对开挖施工按照事前、程和终控三阶段进行了质量控制。

12.Discussion on the Resorts of Controling the Project Quality in Construction Supervision浅谈建设工程施工质量监理控制手段

13.Construction technology and quality control of swelling rock section of tunnel隧道膨胀岩地段施工技术及质量控制

14.On quality and process control for asphalt pavement in blindfold step赶工期阶段沥青路面的质量与进度控制

15.The construction quality control in loess and water rich geological sector of tunnel inclined shaft隧道斜井黄土富水地质地段施工质量控制

16.Quality Management in the Construction of Highway Engineering公路工程施工阶段如何进行质量管理

17.Enhancing construction stage supervision and improving construction project quality加强施工阶段监理 提高建设工程质量

18.How to Control the Cost in the Stage of Construction with the Bill of Quantity用工程量清单计价法施工阶段监理工作的造价控制探讨

相关短句/例句

QualitQuality Control of the Construction Phase施工阶段质量控制

3)the construction phase of quality施工阶段的质量控制

4)construction stage施工阶段

1.How to do well the supervision work in the engineeringconstruction stage;浅析如何做好工程施工阶段的监理工作

2.Engineering cost control in theconstruction stage of the construction project;建设项目施工阶段工程造价控制

3.Discussion on the project cost control inconstruction stage;浅谈施工阶段项目的成本控制

5)construction phase施工阶段

1.Reorganizing method of engineering supervision data inconstruction phase;谈施工阶段工程监理资料的整编方法

2.Analysis on effective cost control measures in design andconstruction phases;浅析设计和施工阶段造价的有效控制

3.Study on announcement system atconstruction phase;浅议工程施工阶段的公示制度

6)constructing stage施工阶段

1.Research on the cost management ofconstructing stage in construction project;浅谈项目施工阶段的造价控制

2.Discussion on cost management ofconstructing stage in construction project;谈建筑工程施工阶段的造价管理

3.Cost control ofconstructing stage during construction items executing process;浅谈建设项目实施过程中施工阶段造价控制

延伸阅读

施工施工constructionshlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段.核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备.施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。