900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 施工通风布置 construction ventilation system layout英语短句 例句大全

施工通风布置 construction ventilation system layout英语短句 例句大全

时间:2018-11-26 06:08:46

相关推荐

施工通风布置 construction ventilation system layout英语短句 例句大全

施工通风布置,construction ventilation system layout

1)construction ventilation system layout施工通风布置

2)construction transport layout施工交通布置

3)construction layout施工布置

1.The construction organization design was seriously prepared andconstruction layout was reasonably made.直孔水电站大坝地处高寒地区,经过认真编制施工组织设计,合理进行施工布置,精心施工,提高了施工质量,冬季施工采用了蓄热法和暖棚法,加快了施工进度,为第1台机组按时发电奠定了基础。

2.This paper introduces the general layout planning of Zhangfeng Reservoir in the design stage, including theconstruction layout condition, the traffic inside and outside the construction site, and general plane layout of the construction, etc.介绍了张峰水库在初设阶段的总体布置规划,其中包括施工布置条件、场内外交通、施工总平面布置等。

3.This paper systematically analyzes main factors affectingconstruction layout,establishes an index system of evaluation scheme and a multiobjective fuzzy optimum seeking model of layout schemes.施工布置方案决择是施工组织设计中的一个重要课题。

4)construction arrangement施工布置

1.Thanks to the appropriateconstruction arrangement and adoption of adequate construction method,the above difficulties had been overcome satisfactorily.针对以上工程特点,合理进行施工布置并采取了有效的施工方法,取得了较好的效果。

2.Practice indicates thatconstruction arrangement and design features for concrete mixing system is successful a.通过实践表明 ,拌和系统的施工布置与设计是成功的 ,其一些优点可供有关施工单位参

5)construction ventilation施工通风

1.Construction ventilation design for an access tunnel in Jinping hydropower station;锦屏水电站辅助洞施工通风设计

2.5 inclined shaft working lot of Lvliangshang extra-long railway tunnel as example,the authors present the features of the multi-working face construction of the long inclined shaft and the main tunnel,propose designedconstruction ventilation schemes and deduct the required air volume and the ventila.施工通风是特长隧道施工组织设计中的一项重要任务,对特长隧道能否顺利建成具有关键性作用,以吕梁山特长铁路隧道5号斜井工区为例,根据长大斜井与正洞多工作面施工的特点,提出设计方案,并据此推算出施工风量布置风机,以选择合理通风方案,并针对该工区施工通风特点提出了建议。

3.The fast and safe construction of deep-buried long tunnels depends on such major constraining factors as driving length,high-pressure ground water,high ground stress,high ground temperature andconstruction ventilation.制约深埋特长隧道快速安全施工的主要因素除包括掘进长度、高压地下水、高地应力、地温、施工通风等,还与特定工程的施工条件具有密切的关系。

英文短句/例句

1.Design and Implement of Bi-shield TBM Construction Ventilation System双护盾TBM施工通风系统的设计和实施

2.Numerical Simulation of TBM Construction Ventilation in Long Diversion Tunnel;长距离引水隧洞TBM施工通风数值模拟

3.Ventilation Technology of Long Tunnel by Using TBM Construction in Zhongtianshan Tunnel中天山特长隧道TBM施工通风技术

4.Construction ventilation for power tunnel system of Nozhadu Hydropower Station糯扎渡水电站引水发电系统施工通风

5.Study on Partition Technology of Ventilation Inclined Shaft in Guanjiao Railway Tunnel关角隧道施工通风斜井分隔技术研究

6.On ventilation technology in tunnel construction of small-section and long-distance pipes小断面长距离管道隧道施工通风技术

7.Construction Ventilation Technology for Tunnels in High Altitude and Low Atmospheric Pressure Area高海拔低气压地区隧道施工通风技术

8.Calculation of Wind Amount Needed by Ventilation During Tunnel Driving Construction and Selection of Equipments隧道掘进施工通风风量计算与设备选择

9.A Study on Construction Ventilation Technology of the Super Long Tunnel-Jin Ping Auxiliary Tunnel;特长隧道锦屏辅助洞施工通风技术研究

10.NUMERICAL SIMULATION OF CONSTRUCTION VENTILATION IN THE UNDERGROUND POWERHOUSE水电站地下主厂房施工通风动态数值模拟

11.Construction Ventilation Design for Water Conveyance Tunnels of Hydropower Stations in Plateau Area高原地区水电站引水隧洞施工通风设计

12.Case Study on Design of Construction Ventilation System of Chaohe Tunnel on Central Route of South-to-North Water Transfer Project南水北调中线工程潮河段隧洞施工通风设计研究

13.Research on Ventilation for Large Scale Underground Cavity Groups Construction;大型地下工程洞室群施工期通风研究

14.Control of Air Flow Passing Through Cross Tunnels in Tunnel Construction Jet Ventilation隧道施工射流通风中横通道的风流控制

15.Study on Ventilation and Heat Elimination in TBM Construction;TBM施工中的通风和散热问题研究

16.The Research on Risk Management Implementation Plan of Communication Engineering Project通信工程项目风险管理实施方案研究

17.On some suggestions for precautions in ventilation and air-conditioning construction通风与空调施工中应注意的几点建议

18.Several problems need attention in installation of ventilating air-condition通风空调安装施工应注意的几个问题

相关短句/例句

construction transport layout施工交通布置

3)construction layout施工布置

1.The construction organization design was seriously prepared andconstruction layout was reasonably made.直孔水电站大坝地处高寒地区,经过认真编制施工组织设计,合理进行施工布置,精心施工,提高了施工质量,冬季施工采用了蓄热法和暖棚法,加快了施工进度,为第1台机组按时发电奠定了基础。

2.This paper introduces the general layout planning of Zhangfeng Reservoir in the design stage, including theconstruction layout condition, the traffic inside and outside the construction site, and general plane layout of the construction, etc.介绍了张峰水库在初设阶段的总体布置规划,其中包括施工布置条件、场内外交通、施工总平面布置等。

3.This paper systematically analyzes main factors affectingconstruction layout,establishes an index system of evaluation scheme and a multiobjective fuzzy optimum seeking model of layout schemes.施工布置方案决择是施工组织设计中的一个重要课题。

4)construction arrangement施工布置

1.Thanks to the appropriateconstruction arrangement and adoption of adequate construction method,the above difficulties had been overcome satisfactorily.针对以上工程特点,合理进行施工布置并采取了有效的施工方法,取得了较好的效果。

2.Practice indicates thatconstruction arrangement and design features for concrete mixing system is successful a.通过实践表明 ,拌和系统的施工布置与设计是成功的 ,其一些优点可供有关施工单位参

5)construction ventilation施工通风

1.Construction ventilation design for an access tunnel in Jinping hydropower station;锦屏水电站辅助洞施工通风设计

2.5 inclined shaft working lot of Lvliangshang extra-long railway tunnel as example,the authors present the features of the multi-working face construction of the long inclined shaft and the main tunnel,propose designedconstruction ventilation schemes and deduct the required air volume and the ventila.施工通风是特长隧道施工组织设计中的一项重要任务,对特长隧道能否顺利建成具有关键性作用,以吕梁山特长铁路隧道5号斜井工区为例,根据长大斜井与正洞多工作面施工的特点,提出设计方案,并据此推算出施工风量布置风机,以选择合理通风方案,并针对该工区施工通风特点提出了建议。

3.The fast and safe construction of deep-buried long tunnels depends on such major constraining factors as driving length,high-pressure ground water,high ground stress,high ground temperature andconstruction ventilation.制约深埋特长隧道快速安全施工的主要因素除包括掘进长度、高压地下水、高地应力、地温、施工通风等,还与特定工程的施工条件具有密切的关系。

6)construction site layout施工总布置

1.Study on three-dimension visualization digital model forconstruction site layout;施工总布置三维可视化数字模型研究

2.Construction site layout of hydroelectric engineering is a complicated system;the technique of three-dimensional visualization modeling forconstruction site layout of hydroelectric engineering is studied deep in this paper.水电工程施工总布置是一个复杂的系统,文中对水电工程施工总布置三维可视化建模技术进行了深入研究。

3.Everycomponent of the engineering is interfered with theconstruction site layout.小湾水电站是澜沧江中下游梯级规划八级电站中的巨型电站,其施工总布置牵涉到工程的各个组成部分,各部分施工本身随时间不断变化,大量动态信息难以把握。

延伸阅读

施工施工constructionshlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段.核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备.施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。