900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 分段安装设备 sectional installation equipment英语短句 例句大全

分段安装设备 sectional installation equipment英语短句 例句大全

时间:2020-10-25 21:18:25

相关推荐

分段安装设备 sectional installation equipment英语短句 例句大全

分段安装设备,sectional installation equipment

1)sectional installation equipment分段安装设备

2)equipment installation设备安装

1.Quality and construction period control forequipment installation of construction projects——Construction organization planning of high-speed wireequipment installation;建设工程设备安装的质量和工期控制——高线工程设备安装施工组织设计的体会

2.Survey control over linkageequipment installation engineering;联动设备安装工程的测量控制

3.Discussion on theequipment installation level control construction technology设备安装标高控制施工技术讨论

英文短句/例句

1.left front electrical equipment mounting左前方电气设备安装

2.or equipment installation next week.或设备安装方面的。

3.installation of mechanical and electric equipment of hydroelectric power station水电站机电设备安装

4."Chemical Equipment Installation Co., Ltd."化工设备安装有限公司

5.Code for designing anti-seismic installation of communication equipment通信设备安装抗震设计规范

6.Drawings for designing anti-seismic installation of communication equipment通信设备安装抗震设计图集

7.Code for design of telecommunications power supply equipment installation通信电源设备安装设计规范

8.Equipment Installation and Design Optimization of Retaining Roadways along Goaf at 6_138 Face6_138工作面沿空留巷设备安装设计优化

9.To equip with a motor.装引擎安装引擎设备

10.Condition of the machinery and equipment to be erected被安装机器设备的情况

11.install a heating or lighting system安装暖气或照明设备

12.Lighting fixture must be installed at once.必须立即安装照明设备。

13.installable device driver可安装的设备驱动程序

14.Setup detected and installed the devices below安装程序检测到并且安装了以下设备

15.Memory installed on or associated with a device.安装在设备上或与设备相关联的内存。

16.Displays legacy devices and devices that are no longer installed显示没有被安装的后补设备和设备

17.You must have an audio device installed in order to encode from device.要从设备编码,必须已安装音频设备。

18.a workman who installs and repairs gas fixtures and appliances.安装和修理煤气设备和装置的工人。

相关短句/例句

equipment installation设备安装

1.Quality and construction period control forequipment installation of construction projects——Construction organization planning of high-speed wireequipment installation;建设工程设备安装的质量和工期控制——高线工程设备安装施工组织设计的体会

2.Survey control over linkageequipment installation engineering;联动设备安装工程的测量控制

3.Discussion on theequipment installation level control construction technology设备安装标高控制施工技术讨论

3)equipment installment设备安装

bined with practical and management experience of Huangshi Ci Lake interception project(I), theequipment installment quality has been emphasized in the construction of sewage treatment projects.结合黄石市磁湖污水截流一期工程实践和管理经验,强调设备安装质量在污水处理工程建设中的重要性。

4)Installation of equipment设备安装

5)installation equipment安装设备

1.Furthermore,the main enterprises for the installation of the wind turbine and the general performance parameters of theirinstallation equipments at home and abroad are introduced as well.介绍了海上风电场建设概况、建设基本流程、海上风电机组的主要安装方式、国内外主要的海上风电机组安装企业及安装设备性能参数。

6)lifting segment by segment分段安装

延伸阅读

步进式加热炉机械设备安装步进式加热炉机械设备安装machinery erection of walkingbeam furnace。u,.‘飞snl Jlarelu Jlxie Shebei anZhuang步进式加热炉机械设备安装(machineryereetion of walking一beam furnaee)步进式加热炉的机械设备除炉体上的炉门及其传动装置外,主要是步进装置。大型加热炉的步进装置有曲柄连杆型加热炉的步进装置为大部件供货。步进装置也有电型、偏心托轮型和斜轨托座型三种型式.曲柄连杆型步动传动的。进装!由框架和曲柄连杆组组成,框架上安装活动梁步进式加热炉的机械设备安装,包括底座、框架、立柱,立柱从炉床上的孔洞插入炉内,柱顶上安装活动立柱及梁、水封及渣槽的安装。加热炉机检设备的安梁,受液压缸的推、拉,框架以曲柄头上的托轮为支承装,要在其基础验收合格后,以装料辊道或出料辊道中作水平移动,两列曲柄连杆同步工作使框架整体水平心线及标高为基准,测量炉子的中心线及标高,并分别地上升或下降;固定梁安装在炉内,它的立柱安装在炉投点标记在中心标板上,记录和标记基准点高程值。床骨架上。偏心托轮型步进装置由框架和偏心托轮组底座安装步进式加热炉的曲柄座、偏心轮座或组成,偏心托轮组有一个总传动,使偏心轮同时举起或斜轨底座数量较多,安装的关键是要控制底座相对高放下框架。斜轨托座型步进装置有两层框架,上层框架差。对于曲柄连杆型和偏心托轮型步进装置底座,应分和下层框架之间及下层框架和斜轨座之间都设有滚别以曲柄轴和偏心轮轴的轴承座剖分面为基准确定标轮.上层框架由液压缸驱动作水平移动,下层框架由液高、控制水平度,以镬孔轴线和轮宽中心为基准找正中压缸驱动在斜轨座上滑行,同时获得水平移动和升降心线。对于斜轨托座型步进装置底座,采用专用工具,动作,水平移动动作由于两层框架间有滚轮存在,不会用平尺、水平仪或水准仪确定标高和调整水平度。见带动上框架移行,但升降动作迫使上框架升降。三种型图。式步进装置的框架都为分片供货,现场组装后安装。小塔尺 严卜什赢一二刊 褪曳…_丛 斜轨托座型步进装置底座标高、水平度测t示意图框架组装与就位框架的结构型式不同,其供货并应根据钢材材质不同采取相应的焊接工艺,焊缝应状态也不同。小型加热炉步进梁框架一般是大部件整全部进行无损检验。体供货,现场不需要预组装,分片供货的大型板坯加热水封及渣槽安装立柱和梁安装完毕并试动框架炉步进梁框架,可以在已安装好的托座上设置临时台确认其在步进范围内无障碍后,即可安装炉底水封及架进行组装,组装后拆除临时台架,并将框架平稳地落框架上的渣槽。到托轮或滑座上。试运行步进式加热炉一般先进行单体试运行,立柱及梁的安装固定立柱和活动立柱、固定梁然后进行联动试运行。联动试运行后,对大型步进式加和活动梁一般均以单根供货.先安装立柱,检查并调整热炉,要检测步进直线偏差。在炉内挂设钢丝线,然后纵、横两个方向的垂直度,柱顶标高、立柱间距以及立从进料门投入钢坯,使其通过炉膛全长,以钢丝线为荃柱与炉子中心线的距离应符合设备技术文件的要求,准测量钢坯端部与钢丝线间的距离,即为钢坯移行直然后安装固定梁和活动梁。梁的连接要进行对口和焊线偏差。该偏差应符合设备技术文件的要求。接,焊接一般采用氢弧焊打底,手工电弧焊多层填焊,(唐燕)

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。