900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 发电系统 power generation system英语短句 例句大全

发电系统 power generation system英语短句 例句大全

时间:2019-04-02 15:15:33

相关推荐

发电系统 power generation system英语短句 例句大全

发电系统,power generation system

1)power generation system发电系统

1.Intelligent optimization on biomass gasification and waste incineration combinedpower generation system;生物质气化与废弃物焚烧联合发电系统智能优化

2.Performance calculation and analysis of IGCCpower generation system;整体煤气化联合循环(IGCC)发电系统性能计算与分析

3.Research on Contactless Automobile Power Generation System;无触点汽车发电系统的研究

英文短句/例句

1.Research on Wind Power Generation System with Asynchronous Generator;采用异步发电机的风力发电系统研究

2.Study on Control and Development of Wind/Photovoltaic Hybrid Power Systems;风/光互补发电系统的管理控制及系统平台研发

3.Research of DC/DC Converter Used in the Fuel Cell Power Generation System;燃料电池发电系统DC/DC变换器的研究

4.Research on the Control of Doubly-Fed Generator in the Wind Energy Conversion System;风力发电系统中双馈电机控制的研究

5.generator-motor system发电机-电动机系统

6.Leonard system steering发电机电动机系统操舵

7.automatic generator control system自控发电机控制系统

8.electronic emitter location system电子发射器定位系统

9.engine-driven generator power system机动发电机动力系统

10.lamp system constant voltage generator照明系统定压发电机

11.engine fire panel发电机消防系统控制板

12.Design of battery supervisory system in the substation and power plant变电站、发电厂蓄电池监控系统设计

13.Research and Exploitation on the System of Electrovalence Calculation;发电上网电价核算系统的研究与开发

14.Design and Development of Power Plant Electricity CAI;发电厂电气部分PPECAI系统的设计和开发

15.On Real-time Simulation System of Interconnected Power System;互联电力系统实时仿真系统开发研究

16.Design and Development of SCR about Electric System on the Vehicle基于SCR系统的车辆电气系统设计开发

17.Modeling of Excitation System and Analysis of Power System with PSS/E;PSS/E的发电机组励磁系统建模和电力系统分析

18.Research and Development of Power System Voltage Stability Assessment System电力系统电压稳定性评估系统的研究和开发

相关短句/例句

generation system发电系统

1.Effect of demand elasticity ongeneration system reliability;需求弹性对发电系统可靠性的影响

2.Novel method for optimizing design of hybrid wind/photovoltaicgeneration system;改进风/光互补发电系统优化设计的新方法

3.An approach to well-being evaluation for large-scale powergeneration system;大型发电系统健康性评估方法研究

3)generating system发电系统

1.Study on control methods for low-power PEMFCgenerating system;小型PEMFC发电系统的控制方法研究

2.A model of marine powergenerating system with variable speed constant frequency/voltage(VSCFCV)is presented.建立一种变速恒频恒压发电系统模型,此发电系统适用于采用电力推进的船舶。

3.Based on the data of East China, several prevailing methods for reserve capacity evaluation ofgenerating systems are compared and the limitations of the deterministic method currently adopted by the East China Grid are pointed out.以华东电网为例,对比了当前国内外3种典型发电系统备用容量的评估方法,指出华东电网现行的确定性方法的不足。

4)power generating system发电系统

1.In order to analyze the risks of spinning reserve scheme from the prospective ofpower generating system, a stochastic variable called spinning reserve’s gain or loss is defined.为了从发电系统角度对旋转备用方案进行风险分析,定义新的随机变量——旋转备用损益,研究了旋转备用损益的概率分布,并用标准半方差量度其风险程度,利用效用函数和效用值反映不同类型(保守型、中立型和冒险型)决策者对旋转备用损益的满意程度,提出旋转备用损益的效用期望值决策模型。

2.Different types ofpower generating system with integrated coal gasification combined cycle (ICGCC) have been presented.介绍不同型式的整体煤气化联合循环(IGCC)发电系统。

3.14, the paper combines the practical condition ofShanghai Power Network and discusses a protective measure from stand ofpower generating system.综合“8·14”美加大停电的教训,结合上海电网的实践,从发电系统的角度出发,阐述发电厂在发生大面积停电时的一种应对措施。

5)power system发电系统

1.Model and simulation of PV-fuel cell hybridpower system;燃料电池-光伏混合发电系统建模与仿真

2.The study ofpower system in new incorporate power supply vehicle;新型一体化电源车中发电系统的研究

3.Based on the SOFC model, a 1 MW SOFCpower system model was established based on Aspen Plus software.针对1MW固体氧化物燃料电池发电系统,建立了描述SOFC电池堆电化学过程和特性的模型,并在此基础上建立了基于Aspen Plus软件平台的SOFC发电系统模型,对其系统参数进行了灵敏度分析和优化。

6)generator system发电机系统

1.Small-gain control ofgenerator system with dynamic uncertainties;动态不确定发电机系统的小增益控制

延伸阅读

发电系统可靠性指标发电系统可靠性指标generating system reli-ability indices概率。由于所有矩形面积之和即所求石ENS,故有csEENs(lh)一艺p(X),MW·h(5)X一况+1当容t模型中的功率步长△X不等于1,且负荷L的值并不恰好使R~Cs一L对应某一停运容量时,则式(5)应修正为几 ::、s(lh)一战[艺尸(x)一。〕,Mw·h(6)式中二为研究期间天数.ci和L,分别为第j天的系统可用发电容t和日峰荷.Li.,为第j夭第k小时的负荷.尸,(·)和F,(·)分别为爪积概率和尽积颇率。式(8)求得的系统故障频率是以天数为基础表示的,即表明出现系统故障的天数而不是故障的次数.因此,与日负荷曲线的形状(例如单峰或双峰曲线)无关。这种情况下的系统故津持续时间指标用下式计算D、(期间)HLOLE(期间) X一况+1式中。=(R/△叉一N)P〔(N+1)△义〕,N=(R/△欠)取整。对于大型系统或△叉不大时,误差。的影响可以忽略。当研究的是某一期间(周、月或年)的指标时,由式(6)可得(略去。)凡(期间)代人上式,得,h/次将式(3)和式(8)D。(期间)万万p,(C,一L,·‘)客[pJ(c,一“J)+六客F,‘c,一“J,·,〕,h/次2一cz~(期间,一“艺万〔艺凡(X)〕,,一IK·lx·几一乙,**MW·式中,为研究期间的天数;电容t。h/期间(7) C为第]天的系统可用发(9)应用两级日负荷模型(见发电系统可金性负待模型)计算系统故障频率时,假定日最高负荷L持续时间为t,并忽略最低负荷L。时发生系统故障的可能性(相当于令L。一0),则式(8)可简化为┌─┐ │团│ ├─┼─┐ │环│不│ ├─┼─┘ │忍│ ├─┼──┬───┐│霎│潍 │洪曰一││ ├──┤刁卜~ ├─┐│ │撇 │ JJ_ │萎│├─┤├───┤ ││曰││厂]│ │└─┴──┴───┴─┘F·‘期间,一客[p,‘C,一L,,+轰F,‘C,一L,,」,次/期间(10)式中n为研究期间天数;c,和乌分别为第j天的系统可用发电容量和日最高负荷;t,为第j天日最高负荷的持续时间。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。