900字范文,内容丰富有趣,生活中的好帮手!
900字范文 > 造价控制 cost control英语短句 例句大全

造价控制 cost control英语短句 例句大全

时间:2018-08-25 09:07:24

相关推荐

造价控制 cost control英语短句 例句大全

造价控制,cost control

1)cost control造价控制

1.Thecost control of general contract in the FGD project of coal-fired power plant;火电厂烟气脱硫工程总承包的造价控制

2.Cost control of deputy construction project;浅谈代建项目的造价控制

3.On the institution design of highway projectcost control;浅谈公路项目造价控制的制度设计

英文短句/例句

1.How to do cost control by cost personnel in realty agency;房地产公司造价人员如何进行造价控制

2.On cost control of whole process with participation of engineering costs advisory service论工程造价咨询机构参与项目全过程造价控制

3.The Analysis of Project Cost Control with Entire Process Cost Management全过程造价管理模式下的工程造价控制分析

4.Cost Management and Control of Water and Electric Power Project Enterprises水利水电工程施工企业的造价管理和造价控制

5.The cost control of capital construction ought to lay stress on the dynamic control in the whole process.基本建设的造价控制应注重全过程的动态控制。

6.The Research on the Application of Cost Control in the Real Estate;造价控制在房地产项目中的应用研究

7.Research on the Project Cost Control and Management of Highway Construction;公路施工项目工程造价控制管理研究

8.Elementary Analysis on Control of Construction Cost in Design Stage of Engineering Construction;浅析工程建设项目设计阶段造价控制

9.On engineering cost control of dredging at Teyong segment in Xinyang Harbor;新洋港特庸段拓浚工程造价控制探讨

10.A Study on Reducing College Building Costs;高校基建工程造价控制的实践与思考

11.The manage and the study of cost control in the stage of construction inviting public bidding;工程招投标阶段的造价控制管理研究

12.Intensifying project cost management,reasonable controlling project cost;加强工程造价管理,合理控制工程造价

13.Cost Supervision-the Effective Way of Monitoring Project Cost;造价监理是控制工程造价的有效途径

14.The Pre-controling of Project Cost in B.B.Q Model;清单计价模式下工程造价的事前控制

15.Invite bidding and bid system is effective measure to control engineering cost招投标制是控制工程造价的有效手段

16.Research on Value-Create Oriented Internal Control System of Our Country;我国价值创造导向内部控制制度研究

17.Improve Establishment Level to Properly Control Construction Cost;提高编制水平 有效控制工程造价

18.Design-limited can efficiently control cost of building.限额设计可以有效地控制工程造价。

相关短句/例句

construction cost control造价控制

1.Shallow discussion in the hospital capital construction project the contract management and theconstruction cost control;浅谈医院基建项目中的合同管理与造价控制

2.Theconstruction cost control runs through the whole course of the engineering project construction.造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。

3.In this paper,the characteristics of construction design stage are discussed, and five methods forconstruction cost control in design phase are put forward, which inspire us further to strengthen control and management in design phase as a governmental policy and ensure feasible technique and reasonable economy designs.项目设计阶段是工程造价控制的关键阶段,但目前我们对设计阶段的造价控制的力度还是不够的。

3)price control造价控制

1.The discussion onprice control in tendering organizing in real estate development project房地产开发项目招标组织中造价控制探讨

2.Discusses to make the goodprice control of construction engineering from three aspects:the decision stage,the design stage and the implement stage.就如何搞好建设工程的造价控制,从决策阶段、设计阶段、实施阶段3方面讨论了工程造价的控制。

4)control of construction cost造价控制

1.In this paper thecontrol of construction cost during engineering design was described and discussed.对工程项目设计阶段的造价控制进行了分析与论述。

2.The key measures to thecontrol of construction cost in foundational construction in high school include choosing the optimum design project, guaranteeing the quality of design.在高校基建工程造价控制工作中,优选工程设计方案和提高设计质量是控制工程造价的关键环节;实行工程招投标和选择优秀施工单位是降低工程造价的有效措施;严格管理施工程序是控制工程造价的重要环节;加强建筑材料管理工作是进行造价控制的迫切需要;认真做好工程预结算编审工作是控制造价的有效保证。

5)project cost control造价控制

1.In this article,project cost control based on valuation with bill quantity was studied.研究在工程量清单计价模式下造价控制,主要从工程量清单编制和工程量清单计价两方面进行论述,提出了在新的计价模式下进行造价控制的新概念。

2.Then the basic theory of the cost of the project is studied,at last a finalproject cost control of the entire process,and the various stages of the work should be carried out.本文回顾了对建设项目全过程造价控制的研究情况,阐述了我国当前建设项目造价管理存在的问题,并且对工程项目造价基本理论进行了研究,最后提出了工程项目进行全过程造价控制,并提出了各阶段应当进行的工作。

3.Starting from the features of theproject cost control of each stage of the engineering construction,this paper expounds that the key of theproject cost control is in the design stage,and points out that should control the project cost by adopting scientific methods after the target is determined rationally.从工程建设各阶段造价控制的特点入手,阐明控制造价的关键在设计阶段,指出在合理地确定控制目标后,应采用科学的方法对造价进行控制。

6)cost control控制造价

延伸阅读

发电工程造价发电工程造价power project construction costfadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。