1)upgrading[英]["?pgreid][美]["?p"gred]增容改造

1.According to the actual operation parameters of Fengman hydropower plant,the runner A835b had been developed by numerical analysis and had been used for theupgrading of unit 3 in the power station.经过电站原型机实测表明:新机组出力、效率、运行稳定性等各项性能指标达到机组增容改造技术协议的要求。

2.Theupgrading scheme of runner of No.对新安江电站2#机增容改造方案进行了分析和论证,以A765转轮为基础转轮,利用CFD进行改型分析计算,在较短时问内确定了转轮及导叶的改型方案,最后通过试验证实各项指标达到了电站改造的要求。

3.Large crossing linesupgrading requires higher acceptable temperature rise and load current of the conductor,as well as satisfies safe clearance requirements without incurring more tower loadings.大跨越输电线路的增容改造,需要在不增加跨越直线塔荷载的情况下,提高导线的允许温升和载流量,并且满足安全距离的要求,特强钢芯高强耐热铝合金导线是较为理想的选择。

英文短句/例句

1.System Optimization Uprating Modification for 300MW Units in Yudong Power Plant裕东电厂300MW机组系统优化与增容改造

2.Economic Evaluation on Capacity Upgrade Project of 300 MW Home-made Turbine国产300MW汽轮机增容改造经济性评价

3.Research on the Capacity Increase and Transformation of Generators Based on the Engineering Practice;基于工程实践的汽轮发电机组增容改造的研究

4.The Research of Rehabilitating and Enhancing for Hydroelectric Set in Liujiaxia Hydropower Plant;刘家峡水电厂水轮发电机组增容改造分析研究

5.The Feasible Research of the Capacity Improvement for the 100MW Unit of LianCheng Power Station;连城电厂100MW汽轮机节能和增容改造可行性研究

6.Analysis and Processing of the Shafting Abnormal Vibration on the Capacity Extension Unit;增容改造机组轴系异常振动的分析与处理

7.Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing葛洲坝电站增容改造机组运行稳定性介绍

8.Force Characteristic Test Technology and Application on Capacity-plus Transformation of Hydroelectric Generating Set水轮发电机组增容改造力特性测试技术及应用

9.The use of Hydraulic Fill Techniques on the Market for Power Plant Ash Transformation Compatibilizer采用水力冲填法对发电厂贮灰场进行增容改造

10.Runner structural design for hydropower station upgrade project浅谈水电站增容改造中的转轮结构设计

11.Capability-increasing Transformation for 310MW generator in Qinshan Nuclear Power Co. Ltd.秦山核电310MW发电机增容改造的工程实践

12.Conductor Selection for ±500 kV Jiyang Large Crossing Transmission Line Upgrading±500kV吉阳大跨越输电线路增容改造导线选择

13.Optimization and Capacity Increase Modification on the Bubbling Buring Boiler of SHF 35-39/450关于SHF35-39/450沸腾燃烧锅炉的优化增容改造

14.Reconstruction Project for Increasing Capacity of Conductor of the Second Crossing Sea Chunnel of Xiamen 220 kV Line:Performance and Spesical Construction Capacity-Technique of Increase-Conductor of Gap Type厦门220kV跨海第二通道增容改造工程——间隙型增容导线的性能和特殊施工方法

15.Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station新安江水电厂2#机增容改造水轮机模型验收试验

16.The Key Technology Research of Unit increasing Capacity Rebuilding for GHPP and Project Management;葛洲坝电站机组增容改造关键技术研究及工程项目管理

17.Capacity-increasing Rebuilding Syudies and Construction Analysis on 3rd Generator of Gezhouba;葛洲坝3号发电机增容改造研究及施工技术分析

18.Study on Asymmetry Three Governors of Electric Control System for Wujiang Hydroelectric Plant, Guizhou Province, China;乌江渡增容改造250MW机组非对称三机调速器电气控制系统研究

相关短句/例句

capacity extension增容改造

1.The technical measures forcapacity extension of 125 MW hydropower units of Gezhouba hydropower station are described.介绍了葛洲坝电站125 MW水轮发电机组增容改造的技术措施。

2.Thecapacity extension cases of hydroturbines(HL211,HL702,ZZ587,ZZ105,PO123) in Hubei province are described;in addition,several relevant problems and suggestions for implementingcapacity extension of hydroturbine are proposed.简述了湖北省5个水电厂水轮机(HL211、HL702、ZZ587、ZZ105、PO123)改造增容的实例;提出了增容改造实施中的几个具体问题及建议。

3)upgrade[英][,?p"ɡre?d][美]["?p"gred]增容改造

1.Runner structural design for hydropower stationupgrade project浅谈水电站增容改造中的转轮结构设计

2.Based on comparison of five alternatives,theupgrade measures for No.山美水电站1#,2#机组增容改造经5个方案比选后,采用更换定子铁芯、定子绕组、转子磁极线圈,并将绝缘等级提高到F级,并改造通风冷却系统,在保持原水电站水工建筑、引水管道、蜗壳、固定导叶、导叶、尾水管、主轴等大件基本不改变的条件下,重新设计、研制新转轮的方案,实施后,单机出力由15 MW增至16。

4)uprating增容改造

1.Shafting abnormal vibration fault usually arises after theuprating on turbo-generator unit.机组增容改造后易发生轴系异常振动。

5)Uprating and refurbishing增容改造

1.Uprating and refurbishing of hydraulic turbines for Gezhouba Hydropower Plant;葛洲坝电站125MW机组水轮机增容改造优化设计

2.n this paper,the hydraulic research,structural design,prototype test from homologous turbine, material election, and manufacture process about uprating and refurbishing of the hydraulic turbine for Liujiaxia plant are describedbriefly,and the measures for improving the anti-abrasion by mud and sand are also discussed.本文简要叙述了刘家峡电厂水轮机增容改造中的水力研究、结构设计、中间试验、材料选择以及制造工艺等方面内容,并探讨了减轻泥砂磨蚀的措施。

6)re-powering改造增容

1.This air describesre-powering of hydraulic turbine (runner) in Fushui Power Station and the results of re- powerin介绍了水轮机改造增容方案及改造后运行结果。